- AdjudicateurKD VODOVOD I KANALIZACIJA d. o. o.
- Lieu d'exécutionSkrad
- Publié le05.08.2026
- Remise des offres01.09.2026, 07 h 30
- Code CPV45231300 · Travaux de construction de conduites d'eau et de canalisations d'eaux usées à grande distance
- DocumentsVoir l'avis officiel
Description du marché
The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.
Ceci n'est pas une publication officielle. Les données publiées sur la plateforme www.simap.ch font foi. Avis n° 41472, repris de l'API publique de simap.ch sans modification; le dossier d'appel d'offres, les questions et le dépôt des offres se font sur simap.